REPLACE LITHIUM WITH THE GRID
DeliveryTag turns flex-load pools into virtual batteries. Same clean energy outcome, zero capex, unlimited duration.
PHYSICAL VS. LOGICAL STORAGE
LI-ION BESS
Store Electrons
Chemical storage of physical electrons during surplus.
Discharge on Peak
Pushing energy back to grid when demand spikes.
DELIVERYTAG FLEX POOL
Consume Normally
Active campus load follows protocol baselines.
Curtail on Signal
Real-time load drop frees grid corridor for remote clean energy.
TECHNICAL PROTOCOL COMPARISON
| Metric | LI-ION BESS | DELIVERYTAG V-BATT |
|---|---|---|
| Initial Capex | $200-400/kWh | $0 CAPEX |
| Levelized Cost | $250-500/MWh | OPEX TBD |
| Discharge Duration | 4h MAX | UNLIMITED |
| System Degradation | YES (CHEMICAL) | ZERO |
| Site Footprint | 1 ACRE / 50MWh | ZERO FOOTPRINT |
Immediate Entry
Continuous Flow
vs BESS Lifecycle
Software Defined
REAL-TIME REROUTING OVER STORAGE
"A physical battery stores electrons at rest. DeliveryTag reroutes energy potential in real-time by manipulating load-baselines."
100MW CAMPUS ANALYSIS
COMPLEMENTARY, NOT COMPETING
Physical BESS Role
Best suited for sub-second frequency regulation, spinning reserve, and extreme short-duration peak shaving where milliseconds matter.
Virtual Battery Role
Superior for congestion management, hourly delivery proof, and sustained grid relief. DeliveryTag provides the duration physical batteries cannot.
READY TO DEPLOY VIRTUAL STORAGE?
INTEGRATION TIMELINE: < 4 WEEKS
Sample output (modeled or pilot data)
A snapshot of what DeliveryTag returns under representative grid conditions.
- Deliverability Score
- 85–95%
- Congestion Impact
- 5–15% of hours
- Physically Verified Clean Energy
- Majority of hours
- Non-deliverable Periods
- Identified and flagged
Impact
- →Improved credibility of 24/7 CFE claims
- →Reduced exposure to non-deliverable matching
- →Potential premium on high-integrity energy contracts